keyboard_arrow_left See all news

Recent News

29 Sep, 2022 /
Seawork Press FP
Riverbusting the new regulations
A new sustainable Pusher Tug provides a state-of-the-art solution for new European emiss...
29 Sep, 2022 /
Seawork Press FP
Joining the fleet
Marine civil engineering contractor and marine plant hire specialist Teignmouth Maritime...
29 Sep, 2022 /
Seawork Press FP
Strong market foothold acquired
Manor Renewable Energy (MRE) has announced the acquisition of OPUS Marine (OPUS), a Germ...
28 Sep, 2022 /
Seawork Press FP
Saving a million tonnes
Accumulated CO2 reductions equal to that which a 16,000-hectare rainforest consumes in a...
27 Sep, 2022 /
Seawork Press FP
Smooth and safe operators
Responsible for all the safe operations of commercial vessels and interactions between l...
15 Dec, 2020
keyboard_arrow_left See all news

New arrivals at MRE

Manor Renewable Energy (MRE) has welcomed Michael Schultz to the team; he joins as Technical Lead and will be based at the new MRE facility in Greenport, Hull.

Head of Sales, Billy Hamilton commented “Mike has a wealth of knowledge and adds an additional level of experience to our team; with the potential within the company this is an exciting time for MRE and the Manor group.”

Late summer saw MRE complete the company’s latest WFSV for the offshore wind sector, the ‘Manor Endurance’. Valued at over £4 million and following a year-long build, the vessel embraces the use of cutting-edge hybrid technology, whilst maximising the accommodation, deck space and cargo carrying capacity.

Built with both efficiency and safety as paramount ‘Manor Endurance’ utilises state-of-the-art quad IPS 900 propulsion units and is available for long-term charter.

Processing. Please wait.
Loading...