keyboard_arrow_left See all news

Recent News

18 May, 2022 /
Seawork Press FP
Ready for action at SEAWORK 2022 
A selection of Gemini RIBs will be on show at Seawork 2022; three commercial Geminis wil...
18 May, 2022 /
Seawork Press FP
Women in Maritime Day - why the tides are turning for women
UKSA, the Isle of Wight based charity and leading maritime training academy, recently an...
18 May, 2022 /
Seawork Press FP
Strategic order guarantees supply pipeline
​​​​​​​Disrupted global logistics and supply chain bottlenecks have caused...
17 May, 2022 /
Seawork Press FP
Going from strength to strength
Soaring demand has led to new and larger premises and an expanding team to fulfil all th...
17 May, 2022 /
Filip Stefanovic
Spillover effects
How the construction industry can stem water pollution at source
11 Sep, 2019
keyboard_arrow_left See all news

All systems are go!

A new high-performance fire-fighting vessel has been fitted with market-leading equipment from Fischer Panda UK.

Built through a partnership between AMC, naval architects Walker Marine Design and fire-fighting equipment supplier Angloco, Fischer Panda UK has joined with Cowes-based aluminium boat builder Aluminium Marine Consultants (AMC) to equip its latest high-performance fire-fighting vessel ‘Barracuda’ with Dometic air conditioning, Mastervolt electrical and CZone digital switching systems.

David Payne, Technical Sales Manager at Fischer Panda UK, said: “We’re delighted to be part of this project. A fire-fighting vessel is a complex craft, and behind the powerful pumps and engines need to be rock-solid control and electrical systems which won’t let the crew down in an emergency, teamed with climate control to keep them and any casualties taken on board comfortable whatever the conditions.

Robin Orledge, Commercial Manager (Technical) / Electrical Supervisor, AMC, said: “We were looking for an electrical system/supplier that would save time, space and improve durability with worldwide support. The C Zone / Mastervolt system has more than met this requirement.

“This was the first project that AMC and Fischer Panda have worked together on. We have had full support from David Payne [Technical Sales Manager, Fischer Panda UK] right from the design phase to final commission at our Cowes yard. After the successful supply and installation in the 14m FiFi, C Zone / Mastervolt is now AMC’s first choice for electrical system supply in all AMC Firefighting / workboats under 16m.”

David Payne added, “Barracuda is the first in a new line of fire-fighting vessels and a significant achievement for the UK marine industry. We look forward to collaborating on many similar projects in the future.”

Commissioned from Angloco at a cost of US $1.4m by the Guyana Fire Service, and as reported elsewhere, the 14m, 32-knot vessel is equipped with three monitors each capable of delivering over 4,000 litres of water per minute at a range of up to 120m.

The new vessel will operate out of Georgetown, Guyana, protecting a 10-mile stretch of the Demerara River. The area hosts significant commercial activity, including food and industrial import/export, and the storage of petroleum products. The craft will also carry out search and rescue missions and marine medical evacuations, and is therefore equipped with accommodation for two stretchers, making efficient air conditioning essential for the welfare of casualties as well as crew.

Processing. Please wait.
Loading...