keyboard_arrow_left See all news

Recent News

29 Sep, 2022 /
Seawork Press FP
Riverbusting the new regulations
A new sustainable Pusher Tug provides a state-of-the-art solution for new European emiss...
29 Sep, 2022 /
Seawork Press FP
Joining the fleet
Marine civil engineering contractor and marine plant hire specialist Teignmouth Maritime...
29 Sep, 2022 /
Seawork Press FP
Strong market foothold acquired
Manor Renewable Energy (MRE) has announced the acquisition of OPUS Marine (OPUS), a Germ...
28 Sep, 2022 /
Seawork Press FP
Saving a million tonnes
Accumulated CO2 reductions equal to that which a 16,000-hectare rainforest consumes in a...
27 Sep, 2022 /
Seawork Press FP
Smooth and safe operators
Responsible for all the safe operations of commercial vessels and interactions between l...
27 Jan, 2021
keyboard_arrow_left See all news

Rebuilding 'Sea-Sense'

Twenty-three years after Walcon delivered the original 'Sea-Sense' berthing installation to the UK Royal Navy, the company has been back at the Jupiter Point naval training facility.

The brief to Walcon, 'replace the entire structure with new, updated equipment' to allow the Royal Navy facility to continue its important role in training naval personnel in a range of seamanship skills.

The two-stage project involved first installing a new 43m bridge and an alongside docking area for RIBs and launches, the latter constructed using Walcon’s heavy-duty Jumbo pontoons, fitted with mesh decking. This was followed by the second stage, the replacement plus extension of the floating storage and launch slipways for the RIBs. This was achieved using twenty, 10-metre long, low-level sloping concrete pontoons to allow for easy launching and retrieval. Situated in an exposed location and subject to intensive, often inexperienced, use the facility has been built to withstand heavy punishment over the long term.


On-the-water rapid launch facilities of this type are also highly suitable for leisure and recreational usage. Sailing clubs, sailing schools and waterside hotels and resorts can benefit from the ability to store boats on but not in the water rather than taking up valuable water-side land that could be put to more profitable use. The time and effort spent in launch and retrieval is also greatly reduced, thereby potentially increasing utilisation rates of the craft. The alongside berthing featured at Jupiter Point is also ideal for use by safety, keel and other, larger leisure boats. Walcon is able to adjust pontoon specifications to reflect the intended usage.

Exhibitor: Walcon Marine Ltd

Processing. Please wait.
Loading...