keyboard_arrow_left See all news

Recent News

11 May, 2022 /
Seawork Press FP
Accelerating ambitious growth
An accomplished professional from South Africa has been recruited to grow the marine bus...
09 May, 2022 /
Seawork Press FP
Weightlifting – saving CO2 emissions
An electric propulsion system for an Estonian shipyard’s new hybrid passenger and bicy...
09 May, 2022 /
Seawork Press FP
Driving investment to gain significant traction
A track record of business transformation and growth in transport, infrastructure, envir...
06 May, 2022 /
Seawork Press FP
Getting down and dirty with silt
Dock operations are compromised, lockgates are not operating correctly, silt is building...
05 May, 2022 /
Seawork Press FP
Speaking at Speed
Commander Tom Trent RN, Future Air Defence Programme Director & Above Water Battlespace ...
27 Jan, 2021
keyboard_arrow_left See all news

Rebuilding 'Sea-Sense'

Twenty-three years after Walcon delivered the original 'Sea-Sense' berthing installation to the UK Royal Navy, the company has been back at the Jupiter Point naval training facility.

The brief to Walcon, 'replace the entire structure with new, updated equipment' to allow the Royal Navy facility to continue its important role in training naval personnel in a range of seamanship skills.

The two-stage project involved first installing a new 43m bridge and an alongside docking area for RIBs and launches, the latter constructed using Walcon’s heavy-duty Jumbo pontoons, fitted with mesh decking. This was followed by the second stage, the replacement plus extension of the floating storage and launch slipways for the RIBs. This was achieved using twenty, 10-metre long, low-level sloping concrete pontoons to allow for easy launching and retrieval. Situated in an exposed location and subject to intensive, often inexperienced, use the facility has been built to withstand heavy punishment over the long term.


On-the-water rapid launch facilities of this type are also highly suitable for leisure and recreational usage. Sailing clubs, sailing schools and waterside hotels and resorts can benefit from the ability to store boats on but not in the water rather than taking up valuable water-side land that could be put to more profitable use. The time and effort spent in launch and retrieval is also greatly reduced, thereby potentially increasing utilisation rates of the craft. The alongside berthing featured at Jupiter Point is also ideal for use by safety, keel and other, larger leisure boats. Walcon is able to adjust pontoon specifications to reflect the intended usage.

Exhibitor: Walcon Marine Ltd

Processing. Please wait.
Loading...