keyboard_arrow_left See all news

Recent News

26 Jan, 2023 /
Seawork Press FP
How to use the full potential of decarbonisation
Narve Mjøs, Vice President of DNV Maritime & and Founder of the Norwegian Green Shippin...
25 Jan, 2023 /
Seawork Press FP
Places and spaces fit for the future
‘A fresh drive to ensure broader representation in the profession of civil engineering...
23 Jan, 2023 /
Seawork Press FP
Hot start to the year
A Hot Water Machine is the first large project to be shipped in 2023 by SMP. Designed or...
19 Jan, 2023 /
Seawork Press FP
£1.6b contract to deliver 2000 jobs
Creating 1,200 UK shipyard jobs, and an expected 800 further jobs across the UK supply c...
19 Jan, 2023 /
Seawork Press FP
Tugboats to reap the benefits
A prototype electric motor unit that will achieve the industry's highest class output de...
18 Jan, 2019
keyboard_arrow_left See all news

Hundreds work on Damen repair and refit

Cunard's Queen Elizabeth has left Damen Shiprepair Brest (DSBr) following a 12-day repair and refit programme. She is the most recent addition to the Cunard fleet, having been delivered in 2010.

The programme was highly intensive with a series of major systems being overhauled or installed. On arrival the ship was placed in Damen Shiprepair Brest’s drydock number 3, one of the largest in Europe at 420 metres, and work began immediately on maintenance to her stabilisers, ABB Azipods, bow thrusters and water intakes.

Meanwhile, above the waterline work was going on to install twin exhaust gas cleaning systems (EGCS) which, along with all the pipe and ducting work, involved the removal of two cabins to accommodate the additional equipment. Inside the vessel, the refurbishment included a series of cabins and corridors, along with the ship’s spa and part of the retail provision. Ashore, DSBr performed routine maintenance to Queen Elizabeth’s lifeboats, life rafts and tenders, and the yard also cleaned and repainted the hull and topsides of the ship.

The project represented a major logistical operation, with multiple third-party teams working alongside the DSBr personnel and each other. DSBr’s experienced project management team ensured that everything went smoothly and that a series of large temporary shelters were available for the contractors’ use.

In the event, the programme was completed a day early, with Queen Elizabeth returning to her home port of Southampton.

Damen Shiprepair Brest is exceptionally convenient for cruise ship operators that use Southampton. The two locations are just 10-12 hours steaming time apart and have excellent ferry and air links. With its drydocks capable of holding the very largest vessels and a spacious, unconstricted site, it has plenty of room for contractors to store and access their materials and equipment, an important requirement for large-scale projects on a tight deadline. With its physical advantages plus an experienced workforce, it is no surprise that DSBr has cruise ship repair and maintenance bookings up to five years ahead.

Processing. Please wait.
Loading...